Tag Archives: Sustrans

Filling potholes…the @Sustrans way


Riding home last night I saw a cowboy. He wasn’t wearing a Stetson and his steed was a digger rather than a lousy piebald. He was shovelling gravel, like you would find on a driveway, into potholes on the farm track … Continue reading

Posted in Cycling, Cycling routes, sustrans | Tagged , | Leave a comment

Bolts, Plugs and Builders Nails


If you listen to some campaigners, our continental cousins enjoy cycling infrastructure that’s like sugar and spice and all things. My own experience is too limited to back that up, but it seems over here the infrastructure is, quite literally, … Continue reading

Posted in Cycling, Cycling routes, National Cycle Network, sustrans | Tagged , , , | Leave a comment

Are Sustrans Masters of Irony?


The harvest is nearly in and my fears about how well the new gravel/hardcore surfaces, on NCN 12/51, would withstand the combined weight of harvesters and tractors have not come to pass. Perhaps just as well, Sustrans are planning a … Continue reading

Posted in Cycling, Cycling routes, National Cycle Network, sustrans | Tagged , , , | Leave a comment

NCN 51 Surface Improvements?


At about the same time that I broke my collar bone, Sustrans started improvement works on the surface of their National Cycle Network route 51, between Southoe and the B661. This work was long overdue. I’m back on the bike … Continue reading

Posted in Cycling, Cycling routes, National Cycle Network, sustrans | Tagged , , , | 4 Comments

Perfect Commute?


A couple of weeks ago I had an email from Sustrans thanking me for completing their cycle to work survey. The email was also publicising a new Sustrans campaign for a national cycle to work standard and had a link … Continue reading

Posted in Boris Bike, Commuting, Cycling, Cycling routes, National Cycle Network, sustrans | Tagged , , | 2 Comments

Bedford to St Neots on Sustrans NCN 51


When it isn’t an inaccessible muddy mess, I’m a regular user of the section of NCN 51 linking St Neots to Huntingdon, and if you follow my blog you’ll probably know I’m quite critical of it. My wider experience of … Continue reading

Posted in Bedford, Countryside, Cycling, National Cycle Network, St Neots, sustrans | Tagged , , , , , | 12 Comments

Oh No! Tall Grass


I have made six commute journeys on my bike this week. On five of them it rained, but on all of them my feet got soaked through. It is not the rain that wets them, neither is it the standing … Continue reading

Posted in Commuting, Cycling, National Cycle Network, sustrans | Tagged , , , , , | Leave a comment

Commuting on the Sustrans National Cycle Network


I use the National Cycle Network (NCN) for commuting and I’ve been thinking of writing a post on my experiences and observations for a while. A report published by Sustrans titled The Real Cycling Revolution has finally prompted me to do … Continue reading

Posted in Bike, Commuting, Cycling, Huntingdon, National Cycle Network, St Neots, sustrans | Tagged , , , , , , , | 6 Comments

The National Cycleway Network. Route 12 the good and the bad.


I’ve recently blogged about repairs to sections of the National Cycle Network, Route 12. I’ve decided to follow this up with a critical post on why I don’t believe this section of NCN Route 12 is fit for purpose. Riding … Continue reading

Posted in Commuting, Cycling, National Cycle Network, sustrans | Tagged , , , | 5 Comments

NCN Route 51 Repairs Update


I set off in the fog for work this morning and headed for the NCN Route 12. From the brief tarmaced section around the back of Southoe I turned left onto the off-road track, and my front wheel nearly skidded … Continue reading

Posted in Commuting, sustrans | Tagged , , , | Leave a comment